Brasserie Illegaal 20HL Brewing System Project

It is a basic project closer to Brussels, which is designed and fabricated based on the principle of easy operation, easy maintaining, so every part of the system is easy to reach and the operation is easier via the basic switch panel.The basic configuration as below: Brewhouse: 20HL three vessel br
Brasserie Illegaal

Brasserie Illegaal

Projects:

20HL Brewing System

Location:

Rue Bollinckx 300, 1190 Forest, Belgium
Brasserie Illegaal 20HL Brewing System Project

Project Description:

It is a basic project closer to Brussels, which is designed and fabricated based on the principle of easy operation, easy maintaining, so every part of the system is easy to reach and the operation is easier via the basic switch panel.




The basic configuration as below:


Brewhouse:


20HL three vessel brewhouse (mash tun+lauter tun+kettle+whirlpool tank)


60HL HLT+Pumps


Cellar:


5×40HL CCT


2×20HL CCT


1×40HL BBT


6×5HL Stacked serving/lagering tank


Control system:


Basic control panel for manual BH operation.


Basic PID manual control for cellar.

Related Pictures

brasserie illegaal 20hl brewing system complete installation in brussels belgium
20hl brewhouse core equipment at brasserie illegaal forest vorst
siemens plc control panel for 20hl brewing system brasserie illegaal
stainless steel fermentation tanks of brasserie illegaal 20hl brewery