Project Description:
This is the 3rd brewery project what we installed in Japan.We talked much with Satashi about the details for each tank because of his limited space,which increase the difficulty,after much communication we design drawing exactly based on Satoshi’s requirement and got his final confirmation.
The basic configuration as below:
Milling unit:
300-400kgs/H malt mill with double rollers.
3.5bbl 2 vessel compact brewhouse(Mash/lauter tun+Kettle/whirlpool tun)
Double stagse PHE for wort cooling, with preset dual strainer.
Tubular heat exchanger for wort cooling before whirlpool
Water system
7BBL brewing tank
7BBL Hot water tank+pump
Cellar system:
4×3.5BBL CCT + 2×2BBL CT , with fully preassembled hard piping and fittings for glycol.
Control system:
PID control
CIP station
5HL CIP station: Alkali tank+acid tank+sterilize tank
Kegging unit
Double heads keg washer
Kegs