-

BRASSERIE L'AMISTA
Project Description:
The basic configuration as below:
Milling unit:
Malt miller
Auger for transferring milled malt from miller to grist hopper
2M3 grist hopper
Chain disc conveyor: transfer malt from grist hopper to mash tun
Automatic 2500L 4 vessel brewhouse(Mash tun+Lauter tun+Kettle tun+Whirlpool tun)
Grain out cabin
Water system
75HL Hot water tank +hot water pump
50HL Cold water tank + cold water pump
Steam unit
500kgs steam boiler
Steam distributor
Steam lines
Cellar system:
2×25HL CCT + 2×50HL CCT , with fully preassembled hard piping and fittings for glycol.
Cooling unit:
2x10HP Chiller+30HL Glycol water tank+Glycol pump+Glycol line etc
Control system:
Automatic Siemens PLC control with touch screen
CIP station
300L CIP station: Alkali tank+acid tank+sterilize tank
Kegging unit
Keg washer
Keg filler
Kegs
Related Pictures
-
English
Español




