La Gorge Fraiche
Project Description:
The basic configuration as below:
Milling unit:
Platform
Malt miller
2 Chain disc conveyors
Grist hopper
3000L 3 vessel brewhouse(Mash tun+Lauter tun+Kettle tun+Whirlpool tun)
Single stage plate heat exchanger
Water system
60HL Hot water tank +hot water pump
55HL Cold water tank + cold water pump
Steam unit
Steam distributor
Steam lines
Cellar system:
6×30HL CCT + 1×30HL BBT , with fully preassembled hard piping and fittings for glycol.
Cooling unit:
1x10HP Chiller+1X15HP Chiller+30HL Glycol water tank+Glycol pump+Glycol line etc
Control system:
Automatic Siemens PLC control with touch screen
CIP station
500L CIP station: Alkali tank+acid tank+pump+piping etc.